Monday, June 16, 2008

Day 1: Sweet Green Tile


Day 1:
. Everything is ripped out! Including the floor!
. Floor = Ceramic tile STUCK to subfloor SCREWED to the sweet green tile (top), then underlayment
. The soffit area was all clear, with the exception of some electrical above the window (we removed the soffit so all cabinets can go to the ceiling)

Big thanks to Bill, Little Bill, Ray and Greg. Fantastic job!

I must say, I kind of dig that green tile.

1 comment:

Kate said...

That is crazy how quickly everything was taken out. I might need to change my vote.

Kate